University of Georgia Chemistry Building Exterior Renovation
Owner: University of Georgia
Delivery Method: Design/Build
size
40,000 square feet
Cost
$4,900,000
duration
24 months
Design Partners:
Menefee Architecture
Superintendent:
Ernest Mendoza
The Blue River group worked with Menefee Architecture and the University of Georgia on the exterior envelope improvements to the original historic Chemistry Building built in 1956. The project involved removal and replacement of windows/ storefronts, refurbishment of the windows, masonary repairs, waterproofing and stucco. The main challenge in this project was to match the replacement bricks with original 1956 bricks and we were able to successfully do that. Due to the extensive nature of this project and the occupied building, we had to sequence this project in 7 different phases so that we could work on different facades.