| Project Dates: |
Multiple Projects since 2004 all completed on schedule |
| Owner: |
Confidentiality Agreement in Effect |
| Architect: |
George Butler Associates |
| Value: |
$2,425,427.00 combined to date |
| Size: |
Varies |
| Delivery Method: |
Construction Management @ Risk & Design-Bid-Build |
|
|
On an ongoing basis, The Blue River Group continues to be engaged by a national telecommunications company to complete HVAC, Fire Protection and Electrical System upgrades at their technical facilities throughout the Southeastern United States. These projects may be as simple as adding a mechanical damper to an existing HVAC system to as complex as installing mobile generator tap boxes, and replacement or addition of new Liebert CRAC units or other HVAC systems that require not only additional electrical requirements, but modifications to the fire alarm and building automation systems centrally controlled from an offsite location. The work is typically completed in operational telecommunication switch facilities and requires the project team to complete their work utilizing approved task specific Methods of Procedure (MOP's) and the work is typically completed during jeopardy windows when switch traffic is minimized. The Blue River Group's team go to extraordinary lengths to thoroughly pre-planning the individual tasks associated with the individual projects to ensure the success of the project team. Since 2004, The Blue River Group has completed this type project in Alabama, Georgia, Florida, Louisiana, Mississippi, North Carolina, South Carolina and Tennessee. To ensure that we can continue to serve our clients across the country, The Blue River Group maintains current general contractor's licenses in a number of states and quickly obtain additional licenses as necessary. |
| |
|
|