|
This SlideShowPro photo gallery requires the Flash Player plugin and a web browser with JavaScript enabled.
|
|
| Project Dates: |
January 2006-September 2006 (completed on schedule) |
| Owner: |
Town of Braselton, Georgia |
| Architect: |
Red Thunder Studios |
| Value: |
$1,368,128.00 |
| Size: |
10,000 square feet |
| Delivery Method: |
Design-Bid-Build |
|
|